Notice: wpdb::prepare was called incorrectly. The query does not contain the correct number of placeholders (2) for the number of arguments passed (3). Please see Debugging in WordPress for more information. (This message was added in version 4.8.3.) in /mnt/web301/c2/99/54507599/htdocs/iphcon_de_wordpress_2015/wp-includes/functions.php on line 3668 Services | iphcon GmbH - international pharma & health concepts
iphcon - international pharma & health concepts
Go back

Services

Three good reasons for operational energy management:

 

  • Save money
  • Preserve nature and environment for oncoming generations
  • Use natural resources only to the extent that they can re-grow naturally without being depleted.

Since the benefits of energy management are offset by overwhelming efforts, we provide asssistance with the implementation!

  • Maintenance
  • Monitoring consumption
  • Controlling

 Download Flyer Energy

 

Cost-cutting plan 1

We examine your system for function, technical status, control precision and energy management to determine the cost-cutting potential.

  • In a first step we share our results with you
Cost-cutting plan 2

Detailed assessment of the following criteria:

Airflow rates, i.e. checking the layout of the air conditioner:

  • Minimum fresh air flow rates

 

Unclean workrooms / examination rooms / radiation treatment / X-ray diagnostics / baths / supply / waste disposal / laundry / pathology / autopsy

  • We also take internal pollutants into account; i.e. moisture and toxins may lead to higher flow volumes.

 

Ventilation system construted of wear-resistant interior, corrosion-resistant and technically smooth material

  • Valves, fire protection shutters, heating and cooling sensors , silencers, heat           recovery units, volume flow controllers, inspection holes, Leakage class C compliant with DIN EN 13779
Cost-cutting plan 3

At the end of this stage we provide a corporate energy management proposal for air conditioning which entails the following:

  • Measures
  • Planning
  • Decision
  • Inventory
  • Drawing up results
  • Determining targets and actions
  • Cost – benefit analysis
  • Estimate
  • Budget planning
  • Finance and development measures
  • Course of action
  • Implementation of targeted measures
  • Monitoring renovation measures
  • Planing & Assembly
  • with the following project stages
  • Efficient technologies/ strategic assessment measures
  • Performance, controlling, optimization, continuous improvement, energy concept
  • Planning, implementation, service and maintenance
  • Facility management
Cost-cutting plan 4

As in step 3, but with focus on the operational energy management of the heating and control system.

  • We provide the means for reducing energy consumption and costs while   maintaining the same level of productivity

 

Objective: To optimize energy implementation in your company, both economically and ecologically – beginning with energy purchase to consumption, by implementing efficient technologies as well as simple energy-saving measures such as turning off unnecessary light sources!

  • Reduce system expenses
  • Reduce energy costs
  • Increase data transparency
  • Elements of energy management
  • Reliability of energy supply
  • Improving market share
  • Cost effectiveness: continuous energy efficiency improvements
  • Sensitize employees
  • Reduction of CO2 emission

 

Information on the EU/ federal government objectives by 2020

  • Improve energy efficiency by 20%
  • Increase regenerative energy sources to 20%
  • Reduce CO2 emissions by 20-40 %